{"id":52124,"date":"2024-01-11T16:05:49","date_gmt":"2024-01-11T16:05:49","guid":{"rendered":"https:\/\/bowman.com\/?post_type=news&#038;p=52124"},"modified":"2025-08-13T19:34:44","modified_gmt":"2025-08-13T19:34:44","slug":"case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability","status":"publish","type":"news","link":"https:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability","title":{"rendered":"CASE STUDY: Impactful Intersection Redesign: Inman Square&#8217;s Path to Safety &#038; Sustainability"},"content":{"rendered":"\n<p>Inman Square (the Square), located in the city of Cambridge, MA, is a bustling commercial and residential community traversed by high volumes of motorists, pedestrians, cyclists and transit users. The intersection of <a href=\"https:\/\/bowman.com\/projects\/inman-sq-intersection-safety-impr\/\">Cambridge Street and Hampshire Street<\/a> in the heart of the Square presented a complex and unusually large crossing with a confusing layout featuring numerous roadway approaches.<\/p>\n\n\n\n<p>This intersection was a persistent challenge, as the convergence of various modes of transportation has led to conflicts and prolonged delays for all users. Consequently, the intersection earned the designation of a collision hot spot, surpassing the average crash rate for signalized intersections in Massachusetts. The urgency of addressing these issues became essential in 2016 when a tragic incident claimed the life of a bicyclist involved in a collision with a vehicle. Recognizing the pressing need for enhancements, city staff, residents, transportation advocates and community stakeholders identified the safety improvements as a high priority.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"52129\" data-src=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-1024x576.jpg\" alt=\"\" class=\"wp-image-52129 lazyload\" data-srcset=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-1024x576.jpg 1024w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-300x169.jpg 300w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-768x432.jpg 768w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-1536x864.jpg 1536w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-2048x1152.jpg 2048w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-4-338x190.jpg 338w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/576;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"576\" data-id=\"52138\" data-src=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-1024x576.jpg\" alt=\"\" class=\"wp-image-52138 lazyload\" data-srcset=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-1024x576.jpg 1024w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-300x169.jpg 300w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-768x432.jpg 768w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-1536x864.jpg 1536w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-2048x1152.jpg 2048w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/MA-Cambridge-Inman-Square-DRONE-2-338x190.jpg 338w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/576;\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-text-align-center\"><em>Inman Square before safety improvements.<\/em><\/p>\n\n\n\n<p>In 2017, the Kleinfelder-led team was selected for the project through a long-standing, on-call services contract with the City of Cambridge, MA. Bowman was at the forefront of this initiative, leading the <a href=\"https:\/\/bowman.com\/services\/transportation-engineering\/\">multimodal transportation<\/a> analysis, concept design development, stakeholder engagement, parking utilization study and surface design for multimodal transportation, including the preparation of plans, specifications and cost estimates.<\/p>\n\n\n\n<p><strong>Challenge: Balancing Safety, Sustainability &amp; Community Needs<\/strong><\/p>\n\n\n\n<p>The improvements needed to align with the city\u2019s commitment to sustainability and <a href=\"https:\/\/www.cambridgema.gov\/streetsandtransportation\/policiesordinancesandplans\/visionzero\">Vision Zero<\/a>, an initiative to eliminate all traffic fatalities and injuries while also increasing safe, healthy and equitable mobility for all. Balancing the demands and preferences of residents, business owners, bicycle transportation advocates, emergency responders and other stakeholders required a comprehensive improvement plan, which needed the backing of the community and their elected officials.<\/p>\n\n\n\n<p><strong>Solution: Comprehensive Design &amp; Engagement<\/strong><\/p>\n\n\n\n<p>Given the significant public interest in the project, transparent and frequent communication was paramount. The project team employed a variety of materials, including graphics, images, traffic simulation, renderings and 3D models to convey information effectively. This audience encompassed individuals with varying levels of understanding of engineering and traffic principles, English-speaking proficiency and access to the internet.<\/p>\n\n\n\n<p>To aid communication and visualization, <a href=\"https:\/\/www.ptvgroup.com\/en\/products\/ptv-vissim\">VISSIM<\/a>, a multi-modal traffic flow microsimulation software, was used. This tool not only assisted in traffic engineering and intersection design but also provided a user-friendly, video game-like format for engaging with the community and stakeholders.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"772\" data-id=\"52131\" data-src=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Community-Engagement-1024x772.png\" alt=\"\" class=\"wp-image-52131 lazyload\" data-srcset=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Community-Engagement-1024x772.png 1024w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Community-Engagement-300x226.png 300w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Community-Engagement-768x579.png 768w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Community-Engagement-252x190.png 252w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Community-Engagement.png 1072w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/772;\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"738\" data-id=\"52139\" data-src=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/City-of-Cambridge-MA-Inman-Square-Intersection-Safety-improvement-Project_Cambridge-MA_3.12-1024x738.jpg\" alt=\"\" class=\"wp-image-52139 lazyload\" data-srcset=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/City-of-Cambridge-MA-Inman-Square-Intersection-Safety-improvement-Project_Cambridge-MA_3.12-1024x738.jpg 1024w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/City-of-Cambridge-MA-Inman-Square-Intersection-Safety-improvement-Project_Cambridge-MA_3.12-300x216.jpg 300w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/City-of-Cambridge-MA-Inman-Square-Intersection-Safety-improvement-Project_Cambridge-MA_3.12-768x554.jpg 768w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/City-of-Cambridge-MA-Inman-Square-Intersection-Safety-improvement-Project_Cambridge-MA_3.12-263x190.jpg 263w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/City-of-Cambridge-MA-Inman-Square-Intersection-Safety-improvement-Project_Cambridge-MA_3.12.jpg 1305w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/738;\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-text-align-center\"><em>Using 3D models &amp; graphics to convey information to the community. <\/em><\/p>\n\n\n\n<p>The project team designed three intersection concepts based on community concerns. These designs were then analyzed from a transportation and spatial perspective. The visioning process was underpinned by a strong engineering foundation, ensuring the practicality and effectiveness of the proposed changes. Each of the design concepts included sidewalk-level separated bicycle lanes, enhanced bus stops and improved pedestrian crossings.<\/p>\n\n\n\n<p><strong>Impact: Safe, Accessible &amp; Sustainable Transportation for All<\/strong><\/p>\n\n\n\n<p>The skewed intersection at Cambridge Street and Hampshire Street was reconfigured into two separate intersections. Additional safety improvements included sidewalk-level separated bicycle lanes with protected phasing, fully accessible sidewalks and crossing islands, floating bus stops and a transit queue-jump lane. The project also reconfigured Vellucci Plaza to create a public gathering place with seating and a public art installation.<\/p>\n\n\n\n<p>Community input was instrumental in revealing the need to enhance the quality and character of the Square and open spaces. The project also accounted for essential truck and fire department access, integrated climate residency measures and advanced the <a href=\"https:\/\/www.cambridgema.gov\/CDD\/Transportation\/gettingaroundcambridge\/bikesincambridge\/bicyclenetworkplan\">city\u2019s bicycle plan<\/a>.<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-4 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"767\" data-id=\"52132\" data-src=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-1024x767.jpg\" alt=\"\" class=\"wp-image-52132 lazyload\" data-srcset=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-1024x767.jpg 1024w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-300x225.jpg 300w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-768x575.jpg 768w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-1536x1150.jpg 1536w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-2048x1534.jpg 2048w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-1-254x190.jpg 254w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/767;\" \/><figcaption class=\"wp-element-caption\"> <\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" width=\"1024\" height=\"631\" data-id=\"52144\" data-src=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p-1024x631.jpg\" alt=\"\" class=\"wp-image-52144 lazyload\" data-srcset=\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p-1024x631.jpg 1024w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p-300x185.jpg 300w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p-768x473.jpg 768w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p-1536x947.jpg 1536w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p-308x190.jpg 308w, https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/Inman-Square-27-p.jpg 2000w\" data-sizes=\"(max-width: 1024px) 100vw, 1024px\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" style=\"--smush-placeholder-width: 1024px; --smush-placeholder-aspect-ratio: 1024\/631;\" \/><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-text-align-center\"><em>Inman Square after safety improvements.<\/em><\/p>\n\n\n\n<p>Operational transportation improvements also provided environmental benefit due to reduced vehicular idling time at the intersection during a signal cycle at peak hour conditions. With the design in place, vehicular idling time is reduced by 29 seconds per day during peak morning and evening hours, which results in a combined vehicular reduction of 69 metric tons of CO<sub>2<\/sub> per year.<\/p>\n\n\n\n<p>The Inman Square safety improvement project demonstrates that planners and designers can undertake transformative urban design projects and successfully move to implementation with the help of local communities. Their voices can be the impetus for imagining how a familiar and historical place can be reimagined to improve infrastructure and safety.<\/p>\n\n\n<p style=\"text-align: center;\"><iframe title=\"YouTube video player\" data-src=\"https:\/\/www.youtube.com\/embed\/cetyQjQwVpY?si=ADFog6_iTHk6Y6pg\" width=\"660\" height=\"415\" frameborder=\"0\" allowfullscreen=\"allowfullscreen\" src=\"data:image\/gif;base64,R0lGODlhAQABAAAAACH5BAEKAAEALAAAAAABAAEAAAICTAEAOw==\" class=\"lazyload\" data-load-mode=\"1\"><\/iframe><\/p>\n\n\n<p>People for Bikes ranked Inman Square #4 on their list of <a href=\"https:\/\/www.peopleforbikes.org\/news\/the-best-new-u.s.-bike-lanes-of-2023\">Best New US Bike Lanes of 2023<\/a>.<\/p>\n\n\n\n<p>Project team: <a href=\"https:\/\/www.kleinfelder.com\/\">Kleinfelder<\/a> served as the lead engineer and designer. <a href=\"https:\/\/www.klopfermartin.com\/\">Klopfer Martin Design Group<\/a> facilitated public engagement and public plaza design and <a href=\"https:\/\/tooledesign.com\/\">Toole Design<\/a> served as a walking and biking advisor.<\/p>\n","protected":false},"featured_media":52145,"template":"","news_tags":[259],"class_list":["post-52124","news","type-news","status-publish","has-post-thumbnail","hentry","news_tags-massachusetts"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CASE STUDY: Impactful Intersection Redesign: Inman Square&#039;s Path to Safety &amp; Sustainability - Bowman<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CASE STUDY: Impactful Intersection Redesign: Inman Square&#039;s Path to Safety &amp; Sustainability - Bowman\" \/>\n<meta property=\"og:description\" content=\"Inman Square (the Square), located in the city of Cambridge, MA, is a bustling commercial and residential community traversed by high volumes of motorists, pedestrians, cyclists and transit users. The intersection of Cambridge Street and Hampshire Street in the heart of the Square presented a complex and unusually large crossing with a confusing layout featuring [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability\" \/>\n<meta property=\"og:site_name\" content=\"Bowman\" \/>\n<meta property=\"article:modified_time\" content=\"2025-08-13T19:34:44+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"235\" \/>\n\t<meta property=\"og:image:height\" content=\"235\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"5 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability\",\"url\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability\",\"name\":\"CASE STUDY: Impactful Intersection Redesign: Inman Square's Path to Safety & Sustainability - Bowman\",\"isPartOf\":{\"@id\":\"https:\/\/bowman.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#primaryimage\"},\"image\":{\"@id\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg\",\"datePublished\":\"2024-01-11T16:05:49+00:00\",\"dateModified\":\"2025-08-13T19:34:44+00:00\",\"breadcrumb\":{\"@id\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#primaryimage\",\"url\":\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg\",\"contentUrl\":\"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg\",\"width\":235,\"height\":235},{\"@type\":\"BreadcrumbList\",\"@id\":\"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/bowman.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"News\",\"item\":\"https:\/\/bowman.com\/news\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"CASE STUDY: Impactful Intersection Redesign: Inman Square&#8217;s Path to Safety &#038; Sustainability\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bowman.com\/#website\",\"url\":\"https:\/\/bowman.com\/\",\"name\":\"Bowman\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bowman.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CASE STUDY: Impactful Intersection Redesign: Inman Square's Path to Safety & Sustainability - Bowman","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability","og_locale":"en_US","og_type":"article","og_title":"CASE STUDY: Impactful Intersection Redesign: Inman Square's Path to Safety & Sustainability - Bowman","og_description":"Inman Square (the Square), located in the city of Cambridge, MA, is a bustling commercial and residential community traversed by high volumes of motorists, pedestrians, cyclists and transit users. The intersection of Cambridge Street and Hampshire Street in the heart of the Square presented a complex and unusually large crossing with a confusing layout featuring [&hellip;]","og_url":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability","og_site_name":"Bowman","article_modified_time":"2025-08-13T19:34:44+00:00","og_image":[{"width":235,"height":235,"url":"http:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"5 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability","url":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability","name":"CASE STUDY: Impactful Intersection Redesign: Inman Square's Path to Safety & Sustainability - Bowman","isPartOf":{"@id":"https:\/\/bowman.com\/#website"},"primaryImageOfPage":{"@id":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#primaryimage"},"image":{"@id":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#primaryimage"},"thumbnailUrl":"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg","datePublished":"2024-01-11T16:05:49+00:00","dateModified":"2025-08-13T19:34:44+00:00","breadcrumb":{"@id":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#primaryimage","url":"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg","contentUrl":"https:\/\/bowman.com\/wp-content\/uploads\/2024\/01\/2024.1_Web-thumbnail_Inman-sqaure-case-study.jpg","width":235,"height":235},{"@type":"BreadcrumbList","@id":"http:\/\/bowman.com\/news\/case-study-impactful-intersection-redesign-inman-squares-path-to-safety-sustainability#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bowman.com\/"},{"@type":"ListItem","position":2,"name":"News","item":"https:\/\/bowman.com\/news"},{"@type":"ListItem","position":3,"name":"CASE STUDY: Impactful Intersection Redesign: Inman Square&#8217;s Path to Safety &#038; Sustainability"}]},{"@type":"WebSite","@id":"https:\/\/bowman.com\/#website","url":"https:\/\/bowman.com\/","name":"Bowman","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bowman.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/news\/52124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/media\/52145"}],"wp:attachment":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/media?parent=52124"}],"wp:term":[{"taxonomy":"news_tags","embeddable":true,"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/news_tags?post=52124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}