{"id":2365,"date":"2020-09-15T23:52:10","date_gmt":"2020-09-15T23:52:10","guid":{"rendered":"https:\/\/bowmanconsulting.com\/projects\/clifton-water-wastewater-treatment-plant\/"},"modified":"2024-10-04T22:51:25","modified_gmt":"2024-10-04T22:51:25","slug":"clifton-water-wastewater-treatment-plant","status":"publish","type":"projects","link":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant","title":{"rendered":"Clifton Water\/Wastewater Treatment Plant"},"content":{"rendered":"<p>Bowman worked with the Town to develop a Preliminary Engineering Report (PER) which included several options for the replacement of the existing Wastewater Treatment Plant. The proposed wastewater treatment plant design improvements includes a 200,000-Gallon Moving Bed Biological Reactor (MBBR) system, rehabilitation of the existing influent pump station, and replacement of the sewerage piping within the project site. The MBBR was selected since it can intensify the treatment of the existing treatment tanks being reused. From the treatment plant, effluent will be moved from the existing plastic lined effluent pond, where it will discharge to the Morenci WWTP. The treatment plant will continue to be a zero discharge plant.<\/p>\n<p>The design also included completion of an Arizona Department of Environmental Quality (ADEQ) Aquifer Protection Program Individual Permit application. The permit application required coordination with the Town of Clifton, Arizona Department of Environmental Quality, as well as other agencies. Additionally, the design phase included funding assistance with UDSA, topographic surveying, civil site plan, final design and bidding.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.<\/p>\n","protected":false},"featured_media":3214,"parent":0,"template":"","meta":[],"project_type":[41,3,33,63,38,194],"class_list":["post-2365","projects","type-projects","status-publish","has-post-thumbnail","hentry","project_type-arizona","project_type-civil-engineering-projects","project_type-public-civic","project_type-survey-geospatial","project_type-water-wastewater","project_type-water-resources"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.4 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Clifton Water\/Wastewater Treatment Plant - Bowman<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Clifton Water\/Wastewater Treatment Plant - Bowman\" \/>\n<meta property=\"og:description\" content=\"Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant\" \/>\n<meta property=\"og:site_name\" content=\"Bowman\" \/>\n<meta property=\"article:modified_time\" content=\"2024-10-04T22:51:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"540\" \/>\n\t<meta property=\"og:image:height\" content=\"355\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant\",\"url\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant\",\"name\":\"Clifton Water\/Wastewater Treatment Plant - Bowman\",\"isPartOf\":{\"@id\":\"https:\/\/bowman.com\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#primaryimage\"},\"image\":{\"@id\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#primaryimage\"},\"thumbnailUrl\":\"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg\",\"datePublished\":\"2020-09-15T23:52:10+00:00\",\"dateModified\":\"2024-10-04T22:51:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#primaryimage\",\"url\":\"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg\",\"contentUrl\":\"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg\",\"width\":540,\"height\":355,\"caption\":\"Clifton Water\/Wastewater Treatment Plant\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/bowman.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Clifton Water\/Wastewater Treatment Plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/bowman.com\/#website\",\"url\":\"https:\/\/bowman.com\/\",\"name\":\"Bowman\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/bowman.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Clifton Water\/Wastewater Treatment Plant - Bowman","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant","og_locale":"en_US","og_type":"article","og_title":"Clifton Water\/Wastewater Treatment Plant - Bowman","og_description":"Bowman provided a PER and Design to replace a trickling filter Wastewater Treatment Plant (WWTP) with a new 200,000 gpd Moving Bed Biological Reactor (MBBR) treatment plant installed inside of the existing concrete treatment tank. Design elements included rehabilitation of the existing influent pump station and existing operations building, a standby generator, and demolition of existing WWTP components. Additional services included surveying and civil design.","og_url":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant","og_site_name":"Bowman","article_modified_time":"2024-10-04T22:51:25+00:00","og_image":[{"width":540,"height":355,"url":"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant","url":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant","name":"Clifton Water\/Wastewater Treatment Plant - Bowman","isPartOf":{"@id":"https:\/\/bowman.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#primaryimage"},"image":{"@id":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#primaryimage"},"thumbnailUrl":"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg","datePublished":"2020-09-15T23:52:10+00:00","dateModified":"2024-10-04T22:51:25+00:00","breadcrumb":{"@id":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#primaryimage","url":"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg","contentUrl":"https:\/\/bowman.com\/wp-content\/uploads\/2020\/09\/Williamsburg_Town-of-Clifton_Thumbnail.jpg","width":540,"height":355,"caption":"Clifton Water\/Wastewater Treatment Plant"},{"@type":"BreadcrumbList","@id":"https:\/\/bowman.com\/projects\/clifton-water-wastewater-treatment-plant#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/bowman.com\/"},{"@type":"ListItem","position":2,"name":"Clifton Water\/Wastewater Treatment Plant"}]},{"@type":"WebSite","@id":"https:\/\/bowman.com\/#website","url":"https:\/\/bowman.com\/","name":"Bowman","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/bowman.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"_links":{"self":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/projects\/2365","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/types\/projects"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/media\/3214"}],"wp:attachment":[{"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/media?parent=2365"}],"wp:term":[{"taxonomy":"project_type","embeddable":true,"href":"https:\/\/bowman.com\/wp-json\/wp\/v2\/project_type?post=2365"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}